Optimisation
CRH · Heavy Fleet

Route Optimisation for Cement Silo Deliveries

VRP multi-stop routing
Time window compliance
Backhauling enabled

The Challenge

Trucks returned empty after delivery, wasting load capacity. Static routing rules and dispatcher-dependent decisions generated systemic fleet inefficiencies. Inability to adapt to real-time traffic or on-site emergencies caused SLA breaches and penalties.

What We Built

A Vehicle Routing Problem (VRP) optimisation system dynamically generates optimal multi-stop routes. Backhauling grouping keeps trucks loaded as long as possible. Automatic constraint management handles time windows, crane times and silo compatibility across the full fleet.

Operational Impact

Increased daily services per available truck. Strict SLA compliance with time windows. Reduced fuel consumption and CO₂ through optimised total kilometres travelled.

Technology Used

Standards

Secure, accountable delivery.

Recognised standards for information security, quality management and responsible data protection.

ENS Alto certificationENS Alto
ISO/IEC 27001 certificationISO 27001
ISO 9001 certificationISO 9001
GDPR complianceGDPR
Contact

Talk to MCCM about your AI roadmap.

Tell us what you want to improve. We will help you shape a practical route from strategy to production.